As preps continue, it’s looking more likely NASA will fly the Artemis II mission

May Be Interested In:Security startup SplxAI raised $7 million to preemptively police AI. Here’s its pitch deck.


Late Saturday night, technicians at Kennedy Space Center in Florida moved the core stage for NASA’s second Space Launch System rocket into position between the vehicle’s two solid-fueled boosters.

Working inside the iconic 52-story-tall Vehicle Assembly Building, ground teams used heavy-duty cranes to first lift the butterscotch orange core stage from its cradle in the VAB’s cavernous transfer aisle, the central passageway between the building’s four rocket assembly bays. The cranes then rotated the structure vertically, allowing workers to disconnect one of the cranes from the bottom of the rocket.

That left the rocket hanging on a 325-ton overhead crane, which would lift it over the transom into the building’s northeast high bay. The Boeing-built core stage weighs about 94 tons (85 metric tons), measures about 212 feet (65 meters) tall, and will contain 730,000 gallons of cryogenic propellant at liftoff. It is the single largest element for NASA’s Artemis II mission, slated to ferry a crew of astronauts around the far side of the Moon as soon as next year.

Finally, ground crews lowered the rocket between the Space Launch System’s twin solid rocket boosters already stacked on a mobile launch platform inside High Bay 3, where NASA assembled Space Shuttles and Saturn V rockets for Apollo lunar missions.

On Sunday, teams inside the VAB connected the core stage to each booster at forward and aft load-bearing attach points. After completing electrical and data connections, engineers will stack a cone-shaped adapter on top of the core stage, followed by the rocket’s upper stage, another adapter ring, and finally the Orion spacecraft that will be home to the four-person Artemis II crew for their 10-day journey through deep space.

Four RS-25 engines left over from NASA’s Space Shuttle program will power the SLS core stage.


Credit:

NASA/Frank Michaux

Through the motions

This will be the first crewed flight of NASA’s Artemis program, which aims to land astronauts on the lunar south pole and eventually build a sustainable human presence on the Moon, with an eye toward future expeditions to Mars. The program’s first crewed lunar landing is penciled in for the Artemis III mission, again using SLS and Orion, but adding a new piece: SpaceX’s enormous Starship rocket will be used as a human-rated lunar lander. Artemis II won’t land, but it will carry people to the vicinity of the Moon for the first time since 1972.

share Share facebook pinterest whatsapp x print

Similar Content

Bloodborne producer establishes Sirius Studio
Bloodborne producer establishes Sirius Studio
Anti-ageing products that actually work: Sali Hughes on the 30 best serums, creams and treatments
Anti-ageing products that actually work: Sali Hughes on the 30 best serums, creams and treatments
Jean Marsh with her Officer of the British Empire (OBE) medal in 2012. Pic: PA
Upstairs, Downstairs actress Jean Marsh dies
We've spotted auroras on Neptune for the first time
We’ve spotted auroras on Neptune for the first time
Texas measles outbreak nears 500 cases as virus spreads among day care kids
Texas measles outbreak nears 500 cases as virus spreads among day care kids
An aerial view of melting icebergs in greenland
The North Pole could wander nearly 90 feet west by the end of the century
Live and Unfiltered: The Day’s Breaking News | © 2025 | Daily News